My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes 08/13/2012 Workshop
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
City Commission Minutes
>
City Commission Minutes Archives
>
2012 City Commission Minutes
>
CC Minutes 08/13/2012 Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:08:50 AM
Creation date
9/12/2012 11:08:04 AM
Metadata
Fields
Template:
City Clerk
Meeting Type
Workshop
City Clerk - Doc Type
Minutes
City Clerk - Date
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CASSELBERRY CITY COMMISSION <br />Minutes of August 13, 2012 — workshop <br />Page 2 of 2 <br />Mr. Ambler shared some statistics compiled by the Environmental Protection Agency (EPA), the American <br />Water Works Association (AWWA) and the American Society of Civil Engineers (ASCE) regarding future <br />funding requirements and estimated shortfalls for utilities nationwide over the next five to twenty -five years. <br />He advised that the EPA estimates that a three to five percent increase in spending for utilities will be needed <br />to close the gap. <br />Mr. Ambler gave a brief overview of each of the components of the City's current utility system, which are: <br />potable water production; potable water distribution system; gravity sewer collection and transmission system; <br />water reclamation facility; and reclaimed water distribution system. He advised that the City's system is very <br />healthy, but the City should take a proactive approach to maintain sustainability of the system. <br />A copy of the PowerPoint presentation is attached to and made a part of these minutes. <br />Discussion: Discussion ensued regarding the asset value and annual cost of each of the City's systems; the <br />service life of the systems; various strategies used to extend service life, including lining and pipe bursting; <br />availability of grants; utility rates; and current and future projects. The Commission requested that they be <br />advised of any issues with regulations that may impact the Casselberry community. <br />Mr. Newlon concluded the workshop by stating that the purpose of the presentation had been to give the <br />Commission some ideas about what the City should be providing as far as resources in order to continue to <br />maintain the infrastructure of the utility system. <br />The Commission thanked Mr. Newlon and Mr. Ambler for providing them with the information. <br />Mayor Glancy adjourned the workshop at 6:57 p.m. <br />DATE MINUTES APPROVED BY CITY COMMISSION: <br />ATTEST: <br />,g f <br />Donna G. Gardner, CMC <br />City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.