Laserfiche WebLink
5. Identify underutilized parcels based on physical condition, age of structure, size and <br />configuration of lot, value of structure versus total value of land and structure combined. <br />~CFRPC staff will note which parcels :ere "double selected", rneani~ig by ph~~sical <br />condition and by GiS analysis of building versus land value. For example, small, odd <br />shaped lots, with stetectures older than 30 years, and where the value of the structure is <br />less than the combined value of the structure and the lot will be scnitinized for <br />tuiderutilization. <br />b. Create a tabular summary that includes the number of parcels, associated acreage, future <br />land rise and zoning assigned to the parcels, o•svnership, and structural value related to <br />land value. <br />ECFRPCSt~If GIS Specialist I, G. lVltarchica, Interns {60% total task} P. Laurien (15%); K. <br />SITlitll (2O°Io); C. Paskausl~aS (5%~ <br />Delrver~rbles: zxap series and data from Task B items 1-7 above, due at Task completion. <br />Trine to carnylete Taslc B: 15 working days after completion of Task A. <br />Task G Tdenti O ortuni Sites for Potential Future Redevelo meat <br />In an effort to spur private sector interest in parcel assembly within the C[ZA Districts, an <br />analysis of the potential to assemble or readjust property will be conducted. This analysis <br />will utilize the infot~nation developed in Task B and is also intended to explore innovative <br />approaches to parcel readjustment. For example, see Land Rea~f~rrstnx~nt - Le~rrrirrg from <br />Inter~tional Researrla, Planning, February, 2008. In any case, all parcel options will consider <br />antiquated parcel layout, age of structure, degree of underutilization (physical condition, <br />vacant, size of parcel, adjacency to other ~tenderutilized parcels); location relative to current <br />services and natural features. Develop an alternate parcel assemblymap in cooperation with <br />the CasselberryPlaiulingDepartment. <br />ECFRPCStaff P. Laurien (20%); S. Bitar (20%); GIS Specialist T, G. Marchica, Intern <br />(40%); K. Smith (20%} <br />1. Identifyprospective parcels for reassembly (oppom~nity sites), based upon: <br />a }age of structure; <br />b.) size and configuration of Iot; <br />c.) exterior condition <br />d.} valuation of Iot and structure. <br />e.) adjacent stt-ttctures and lots and their degree of underutilization. <br />f.) the potential size and configuration of a reassemblyof contiguotes parcels. <br />Deliverables: A map of opportunitysites for potential redevelopment `vithin the CRA. <br />Trine to carl1nlefe Taslr G T5 working days after completion of Task B <br />Casseiberry X7-9z Corridor CRA Tnveettory Co~etract v9 10 6 09 4 <br />