Laserfiche WebLink
Chinchor Group 1. Signal Construction <br />Project: <br />No. Pa Item Descri lion Action Quantit Units Unit Price Total Price <br />1 102-1 Maintenance of Traffic MOT F/I 1 EA $ 1,117.25 $ 1,117.25 <br />4 522-1 Concrete Sidewalk, 4" F/I 10 SY $ 105.66 $ 1,056.61 <br />7 575-1-2 Sod St. Au ustine F/I 100 SY $ 7.40 $ 740.03 <br />9 620-1-1 Groundin Electrode F/I 200 LF $ 3.86 $ 772.93 <br />11 630-1-12 Conduit, Under round F/I 1500 LF $ 5.26 $ 7,890.00 <br />15 630-1-17 Conduit, Directional Bore F/I 400 LF $ 14.67 $ 5,868.00 <br />18 632-7-1 Si nal Cable F/I 1 PI $ 3,449.47 $ 3 449.47 <br />30 635-1-11 Pull & Junction Box, Ground Mounted F/I 10 EA $ 241.88 $ 2,418.80 <br />35 639-1-22 Electrical owerserv.,under round F/I 1 AS $ 1,029,75 $ 1,029.75 <br />85 647-B GeotechnicalTestin forfoundatlons F 1 PI $ 1,913.43 $ 1913.43 <br />86 647-C Pre-Excavation er structure F 3 EA $ 269.57 $ 808.71 <br />87 647-D Vacuum Excavation /Soft Di er structure F 3 EA $ 1 530.75 $ 4,592.24 <br />89 647-F Foundation Ins ection F 1 PI $ 1,769.98 $ 1,769.98 <br />92 648-1 B 48" conc. found. for mast arms PF F/I 60 LF $ 421.33 $ 25 279.80 <br />127 648-11-25F Mast arm steel sin le arm Fluted F/I 1 EA $ 5 413.47 $ 5,413.47 <br />141 648-11-60F Mast arm steel sin le arm Fluted Fll 1 EA $ 9 161.72 $ 9,161.72 <br />219 648-13-115F Mast arm steel double arm Fluted F/1 1 EA $ 15,937.02 $ 15 937.02 <br />242 648-99D Mast arm decorative base sin le arm under 60' F/1 3 EA $ 2,439.27 $ 7,317.81 <br />251 650-1-111A Si nal lens onl - 12" red LED ball F/I 8 EA $ 96.23 $ 769.82 <br />253 650-1-111C Si nal lens onI - 12" ellow LED ball FII 8 EA $ 111.72 $ 893.77 <br />255 650-1-111E Si nal lens onl - 12" reen LED ball F/I 8 EA $ 162.96 $ 1 303,66 <br />257 650-1-111G Si nal lens onI - 12" red LED arrow F/I 1 EA $ 101.24 101.24 <br />259 650-1-1111 Si nal lens onl - 12" ellow LED arrow F/I 3 EA $ 104.73 $ 314.20 <br />261 650-1-111K Si nal lens onl - 12" reen LED arrow F!I 3 EA $ 114.05 $ 342.15 <br />269 650-1-111 S Si nal Tens onl -countdown edestrian LED F/I 6 EA $ 437.46 $ 2,624.73 <br />275 650-1-131 Si naI head 12" std 3 section 1 wa F/I 7 EA $ 452.21 $ 3 165.44 <br />297 650-9-151 Si nal head 12" std. 5S 1W F/I 2 EA $ 746.86 $ 1,493.73 <br />301 653-111 Si nal ed inc., int. s m. F/I 2 EA $ 393.84 $ 787.68 <br />303 653-112 Si nal ed inc., Int. s m. 2W F/I 2 EA $ 742.75 $ 1 485.50 <br />309 659-107 Aluminum edestal F/I 1 EA $ 445.49 $ 445.49 <br />331 663-70H Emer. re-em lion detector relocate- 3 directions IO 1 EA $ 1,170.57 $ 1 170.57 <br />346 665-13 Pedestrian detector det.w/si n onl F/I 6 AS $ 138.09 $ 828.51 <br />348 670-110A Cabinet, base onl F/I 1 EA $ 638.90 $ 638.90 <br />349 670-1108 Cabinet, Install onl 10 1 EA $ 449.29 $ 449.29 <br />357 690-10 Si nal head traffic assembl remove R 9 EA $ 22.46 $ 202.18 <br />358 690-20 Si naI edestrian assembl remove R 4 EA $ 22.46 $ 89.86 <br />359 690-30 Pole remove RD 4 EA $ 1 355.41 $ 5 421.64 <br />362 690-50 Controller assembl remove R 1 EA $ 224.64 $ 224.64 <br />363 690-70 Detector edestrian assembl remove R 4 EA $ 22.46 $ 89.86 <br />364 690-80 San wire assembl remove R 1 EA $ 539.14 $ 539.14 <br />365 690-90 Conduit and cablin remove RD 1 PI $ 224.64 $ 224.64 <br />368 690-100 Si nal a ui ment misc. remove R 1 EA $ 112.32 $ 112.32 <br />375 700-89-1 G LED Illuminated Street Si n - 6' b 19" F/I 4 EA $ 2 158.62 $ 8,634.47 <br />387 715-99 Luminaire -acorn st le Fll 3 EA $ 1 580.30 $ 4,740.91 <br /> Subtotal $ 133 631.35 <br /> Mobilization - 5% of Subtotal $ 6,681.57 <br /> Total $ 140 312.92 <br /> <br /> NOTES for item 648-98A, this adds the indicated % of the furnish onl arm item for the first additional item above base loadin <br /> for item 648-988, this adds the Indicated % of the furnish onl arm item for each additional item above base loadin after the first item <br /> <br />