My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-2139 Construction Engineering Inspection Services for US 17-92 Right-of-Way Improvements Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2010 Resolutions
>
10-2139 Construction Engineering Inspection Services for US 17-92 Right-of-Way Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2010 4:46:39 PM
Creation date
5/24/2010 4:46:08 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
5/10/2010
Doc Number
10-2139
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Mark Gisclar <br />Page 3 <br />February 3, 2010 <br />Consultant Project Administrator: The individual assigned by the Consultant to <br />manage one or more Construction Projects. <br />Contractor: The individual, firm, or company contracting with the City for <br />performance of work or furnishing of materials. <br />Contract: The written Agreement between the City and the Contractor setting forth the <br />obligations of the parties thereto, including but not limited to the performance of the <br />work, furnishing of labor and materials, and the basis of payment. <br />4.0 ITEMS TO BE FURNISHED BY THE CITY TO CONSULTANT: <br />The City on an as needed basis will furnish the following items. The Consultant shall <br />submit a request in writing for items needed to the City Construction Engineer. <br />• Contract documents for each project as follows: <br />Construction Plans <br />Special Provisions, General Conditions, Technical Specifications <br />Copy of Executed Contract <br />® The City may provide office space for the CE&I staff located at the Public <br />Works Office for purposes of retaining files and periodic use for preparing <br />reports, documenting project progress and similar administrative functions. <br />The Consultant will be copied with and shall comply with all City policies <br />related to occupancy of the office facilities. <br />® A list of all City standard forms for use under the terms of this Agreement will <br />be provided in hard copy. All pertinent FDOT directives, procedures, and <br />Standard Forms shall be accessed through the Department's Internet website. <br />5.0 ITEMS FURNISHED BY THE CONSULTANT: <br />5.1 City Documents: <br />All applicable City documents and any relevant Department documents shall be a <br />condition of this Agreement. <br />5.2 Vehicles <br />Vehicles will be equipped with appropriate safety equipment and can effectively carry <br />out their responsibilities under this agreement. .Vehicles shall have the name and <br />phone number of the consulting firm visibly displayed. <br />5.3 Field Equipment: <br />The Consultant shall supply survey, inspection and testing equipment, essential in <br />order to carry out the work under this Agreement, and other items as determined by the <br />Construction Project Manager. Quality of such items is to meet the Construction <br />Project Manager's approval. <br />Hard hats shall have the name of the consulting firm visibly displayed. <br />The Consultant will provide those non-consumable and non-expendable items, which <br />are normally needed for a CEI project and are essential in order to carry out the work <br />under this Agreement. <br />HDREngineering,lnc. <br />315 E Robinson Street I Phone:1407) 420-4200 <br />Suite 400 Fax: 14071420-4242 <br />Orlando, FL 32801.1949 www.hdrinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.