Laserfiche WebLink
<br />SECTION 1 <br />PURPOSE OF SUPPLEMENT <br /> <br />The purpose of this Supplement is to provide for Engineering Services, more <br />specifically itemized herein, in the preparation of engineering documents for the <br />installation of approximately 760 lineal feet of 6-inch water main from its present <br />terminus at the Water Reclamation Facility (WRF) fire hydrant location to the Transfer <br />Pump Station. During the typical peak irrigation demand period (May and early June of <br />each year), the City of Casselberry does not have the wastewater flow volumes needed <br />to produce sufficient reclaimed water to provide all customers with the quantities <br />desired. This connection would provide augmentation only at times when sufficient <br />reclaimed water is not available. <br /> <br />SECTION 2 <br />SCOPE OF SERVICES <br /> <br />2.0 General <br /> <br />The Scope of Services is attached as Exhibit 1 . <br /> <br />SECTION 3 <br />GENERAL SERVICES OF THE ENGINEER <br /> <br />3.0 General <br /> <br />A. The ENGINEER shall provide all services required to complete each task in <br />accordance with the regulatory requirements in effect on the date of this <br />Supplement to the extent of the scope of work as defined and set out in this <br />Supplement. The ENGINEER shall perform professional services as <br />hereinafter stated in accordance with good engineering practices. <br /> <br />B. The ENGINEER will serve as the OWNER's professional engineering <br />representative in those phases of the project to which this Supplement <br />applies and will meet, consult with, and provide advice to the OWNER during <br />the performance of these services. The ENGINEER will perform the services <br />for the City Commission under the direction of the Public Works Director. <br />The Principal-in-Charge/Project Manager will be Terry M. Zaudtke, P.E., <br />BCEE and the Project Engineer will be William C. Goucher, P.E. <br /> <br />2 <br />