My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1983 Change Order No. 9 North Winter Park Drive Realignment Project - Prime Construction Group
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1983 Change Order No. 9 North Winter Park Drive Realignment Project - Prime Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2008 11:50:05 AM
Creation date
12/11/2008 11:50:05 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
12/8/2008
Doc Number
08-1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Randy K. Stagg <br />DRMP <br />95 Triplet Lake Dr. <br />Casselberry, FL 32707 <br /> <br />566-02-025 <br /> <br />... <br /> <br />- <br />- <br />, <br />, <br />- <br />- <br />, <br />, <br />, <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRIM. <br />CONsTRUCTION GROUp,INC. <br />~IIIIIIIII~ <br /> <br />October 13, 2008 <br /> <br />Re: 566 - North Winter Park Drive <br />CO Proposal - Misc. Utility Work (South End) <br /> <br />Attached please find the change order proposal for the miscellaneous utility work performed by <br />PCG at South end of the project. <br /> <br />The contract drawings did not show the various utility connections to existing properties on <br />Winter Park Drive just south of 7'" Street. City of Casselberry requested the below work while <br />we were installing utility mains in this area: <br /> <br />. 8" sanitary service to 7'" St. trailer park and City yard - one each at $2,145 = $2,145. <br />. 4" san servo to house #'s 781, 770, 792 & 791 on WPD - four each at $1,373 = $5,492 <br />. 0/." water service to house #'s 770, 792 & 791 on WPD - three each at $1,453 = $4,359 <br />. 8" Service crossing old WPD (Install and Remove) - one each at $5,484 = $5,484 <br /> <br />The existing pay items for the utility connections could not be utilized since this work involved <br />road crossing including MOT, asphalt patch, sidewalk repair, etc. <br /> <br />This proposal includes all labor, material and equipment costs. The total value of the above <br />proposal is valued at $17,480 and five (5) extra working days. <br /> <br />If you have any questions regarding the Change Order Proposal, please do not hesitate to call. <br /> <br />Sincerely, <br /> <br /> <br />Our People Make the Difference with Pride, Integrity and Quality <br /> <br />11000 Jetstream Dr. I P.O. Box 590507 I Phone: 407.856.8180 <br />Orlando, FL 32824 Orlando, FL 32859-0507 Fax: 407.856.8182 <br /> <br />I www.pcginc.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.