My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1983 Change Order No. 9 North Winter Park Drive Realignment Project - Prime Construction Group
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1983 Change Order No. 9 North Winter Park Drive Realignment Project - Prime Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2008 11:50:05 AM
Creation date
12/11/2008 11:50:05 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
12/8/2008
Doc Number
08-1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Randy K. Stagg <br />DRMP <br />95 Triplet Lake Dr. <br />Casselberry, FL 32707 <br /> <br />566-02-026R <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRIM. <br />CONSTRUCTION GROUp,INC. <br />""'II'IIII~ <br /> <br />October 29, 2008 <br /> <br />Re: 566 - North Winter Park Drive <br />CO Proposal-Install 6" Water Line - Helen Street (REVISION 1) <br /> <br />Attached please find the REVISED change order proposal for the 6" water line crossing <br />WPD at approx. sta. 183+50. The city requested the proposal in the progress meeting <br />on October 9, 2008. <br /> <br />The above work includes removing and disposing approximate 200 fl of existing AC <br />pipe and installing approximate 200 fl of 6" PVC pipe crossing Winter Park Drive. <br /> <br />This is a unit price proposal and includes all labor, material and equipment costs. The <br />total value of the above proposal is valued at $9,000.00 and two (2) extra working days <br />based on the quantities showing on the attached sheet. The final quantity will be <br />measured and billed for payment once the work is complete. <br /> <br />If you have any questions regarding the Change Order Proposal, please do not hesitate <br />to call. <br /> <br />Sincerely, <br /> <br /> <br />Ketan Patel <br />Project Manager <br /> <br />Our People Make the Difference with Pride, Integrity and Quality <br /> <br />11000 Jetstream Dr. I P.O. Box 590507 I Phone: 407.856.8180 <br />Orlando, FL 32824 Orlando, FL 32859-0507 Fax: 407.856.8182 <br /> <br />I www.pcginc.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.