Laserfiche WebLink
<br />PROJECT NO. 0706 <br /> <br />II. WORK CHANGED BY CHANGE ORDER <br /> <br />1. Required Chanqes replace an existing asbestos cement water main <br />and provide utility service to several homes. <br /> <br />2. Justification During the construction of the Winter Park Drive North <br />Realignment Project PRIME Construction Group and the Public Works <br />Department noticed an existing asbestos cement water main would remain <br />under the new Winter Park Drive North road. Due to the age and condition <br />of this existing water main, it is beneficial to replace the pipe with new PVC <br />pipe. The original design plans also did not include replacing service <br />connections for several different houses affected by the utility relocations on <br />the project. <br /> <br />3. Payment <br /> <br />Requests (see attached for detailed breakdowns) <br /> <br />#1 - <br /> <br />#2 - <br /> <br />#3 - <br /> <br />#4- <br /> <br />#5 - <br /> <br />#6 - <br /> <br />Subtotal <br /> <br />$ <br /> <br />Additional Bond Premium <br /> <br />$ <br /> <br />Total <br /> <br />$ 26,480.00 <br /> <br />III. WAIVER <br /> <br />00940 - 3 <br />City of Casselberry <br /> <br />Version 4/01 <br />