Laserfiche WebLink
<br />EXHIBIT "A" <br /> <br /> <br />"'rosLo"," stap]>ers. I"'-C. <br />7600 Ncctti:j lScc~~i:j Clrde <br />CjLe~ SOl~iI\,t MClYJj' FlOy~dCl 32040 <br /> <br />Proposal <br /> <br />Date: 9/12/08 <br /> <br />Attn: Mr. Kellv Brock <br />Citv ofCasselberrv <br />95 Triplet Lake Drive <br />Casselberrv. FL 32707 <br /> <br />Proiect Name: Gee Creek Erosion Control <br />Address: Gee Creek Lane. Casselberrv. FL 32707 <br /> <br />We are submitting this proposal to reconstruct the diversion ditch which was damaged <br />during Hurricane Faye. This proposal will also cover damages to the gabion side where <br />large quantities ofboITOW was eroded from high water and damages to the geotextile <br />lining the ditch. Erosion Stoppers will furnish all materials, labor and equipment to <br />complete the repairs. <br /> <br />For the lump sum cost of $42,583.76 (Forty Two Thousand Five Hundred Eighty Three <br />Dollars and Seventy Six Cent) with cost breakout as follows: <br /> <br />200 Excavator w/ operator - $833.95 / Day x 20 Days = $16,679.00 <br />Four Person Crew - $757.47 / Day x 20 Days = $15,149.40 <br />Materials (Plastic Matting and Excelsior Matting) - $3.88 / SY x 2,772 SY = $10,755.36 <br /> <br />Thank you for your time and consideration we guarantee you will be completely satisfied <br />with our services. Please contact us with any questions you may have. <br /> <br />Thank you, <br /> <br />Rick Diggs <br />Erosion Stoppers, Inc. <br /> <br />j04-2.7-5-4300 . 1.-1500-1504-7351 . FClx:304-275-3:sJ2 <br /> <br />FVlA,CI~L: ~lAfo@e\"os~ov\"-stap"peYs.coVlA, . W'NW.e\"os~ov\"-stop"pe\"s.cow.. <br />