Laserfiche WebLink
<br />Board of Adjustment <br />September 27. 2007 <br />Page 2 <br /> <br /> <br />of <br /> <br /> <br />the <br /> <br />in <br /> <br /> <br />were: <br /> <br /> <br /> <br />to come <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />from <br /> <br /> <br />of <br /> <br />or <br /> <br /> <br /> <br />was a <br /> <br />was <br /> <br />in <br /> <br />if a <br /> <br />structure <br /> <br />was not <br /> <br />on the <br /> <br />He <br /> <br /> <br />was later informed that a <br /> <br />is required in <br /> <br /> <br />of <br /> <br />and <br /> <br /> <br />Mr. Diehl <br /> <br /> <br />of <br /> <br />in <br /> <br />in <br /> <br />of <br /> <br /> <br />Diehl <br /> <br />an underground <br /> <br /> <br /> <br />to <br /> <br /> <br /> <br />some of the <br /> <br />which <br /> <br />the <br /> <br />to 1 <br /> <br />impervious <br /> <br /> <br />Mr. Diehl <br /> <br /> <br />a <br /> <br />of neighbors have more than required 50% pervious/impervious <br /> <br />He <br /> <br /> <br />the <br /> <br /> <br /> <br /> <br />In <br /> <br />to the question, Mr. Diehl explained drainage improvements that were made to property. A <br /> <br /> <br />on his <br /> <br />and <br /> <br />neighbor's <br /> <br />In response to the Board's question, Mr. Diehl said that he provided his address and the proposed improvements to his <br /> <br />to Seminole <br /> <br />Plan <br /> <br />was not informed <br /> <br /> <br />was <br /> <br />within <br /> <br />limits of <br /> <br /> <br />the County indicated a permit would be required if a permanent structure was constructed on the <br /> <br />Mr. Diehl <br /> <br />the gazebo is designed so that it could removed before a storm or hurricane. <br /> <br />In response to the Board's question, Mr. <br /> <br />that Ms. Phyllis Wallace, Public Works Department, has reviewed <br /> <br />the drainage design for Mr. Diehl's property. Mr. Senzee explained that current development requires a master stormwater tract for <br /> <br />the entire community for aquifer recharge and drainage. He said in the past each lot was maximized; however, it let each lot stand <br />