Laserfiche WebLink
<br />Board of Adjustment <br />August 23, 2007 <br />Page 5 <br /> <br />to <br /> <br /> <br />or <br /> <br /> <br />of structure <br /> <br /> <br /> <br />if <br /> <br /> <br />it <br /> <br /> <br /> <br />to a <br /> <br /> <br /> <br /> <br />(a <br /> <br /> <br /> <br /> <br />was <br /> <br />on <br /> <br />not <br /> <br />cost <br /> <br />structure, <br /> <br /> <br /> <br />in <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />of <br /> <br /> <br /> <br /> <br /> <br />were: <br /> <br /> <br />within 60 <br />with <br /> <br /> <br /> <br /> to a family cost of <br />of the duplex. <br />to come In to Mr. Moffitt is not <br />however, is a multi-family in area. applicant was <br /> <br /> <br /> <br /> <br />is a <br /> <br /> <br /> <br />Mr. Moffitt <br /> <br /> <br />bid <br /> <br />was <br /> <br /> <br /> <br />Mr. <br /> <br />gutting <br /> <br /> <br />and converting it to a single <br /> <br />family <br /> <br />Mr. Moffitt <br /> <br />that the contractor <br /> <br />it would be more cost effective to demolish the duplex. <br />