My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1942 CPH Engineers Supplement No. 26 Emergency Design & Inspection Services for Queens Mirror Lake/South Triplet Channel Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1942 CPH Engineers Supplement No. 26 Emergency Design & Inspection Services for Queens Mirror Lake/South Triplet Channel Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2008 7:19:51 PM
Creation date
9/24/2008 7:19:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/22/2008
Doc Number
08-1942
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 1 <br />PURPOSE OF SUPPLEMENT <br /> <br />The purpose of this Supplement is to provide for Engineering Services, more <br />specifically itemized herein, in tile preparation of contract documents and permit <br />applications for the installation of approximately 500 lineal feet +/- of sheet piling along <br />the canal between South Lake Triplet and Queens Mirror. It includes both sides of the <br />canal (adjacent to private property) from the bridge on Queens Mirror Circle east along <br />the canal to Queens Mirror Lake. It also includes the section from the existing lifi station <br />to the bridge on the west side of the bridge parallel to the south bank of the canal. <br /> <br />SECTION 2 <br />SCOPE OF SERVICES <br /> <br />2.0 generiJ! <br /> <br />The Scope of Services is attached as Exhibit '1. <br /> <br />SECTION 3 <br />GENERAL SERVICES OF THE ENGINEER <br /> <br />3.0 General <br /> <br />A. The ENGINEER shall provide all services required to complete each tasl< in <br />accordance with the regulatory requirements in effect on the date of this <br />Supplement to the extent of the scope of work as defined and set out in this <br />Supplement. The ENGINEER shall perform professional services as <br />hereinafter stated in accordance with good engineering practices. <br /> <br />B. The ENGINEER will serve as the OWNER's professional engineering <br />representative in those phases of the project to which this Supplement <br />applies and will meet, consult with, and provide advice to the OWNER during <br />the performance of these services. The ENGINEER will perform the services <br />for the City Commission under the direction of the Public Works Director. <br />The Principal-in-Charge/Project Manager will be Terry M. Zaudtke, P.E., <br />BCEE and the Project Engineer will be William C Goucher, r.E. <br /> <br />C, The ENGINfT:R will attend and participate in regular progress rneetings and <br /> <br />o <br />,- <br />
The URL can be used to link to this page
Your browser does not support the video tag.