My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-1943 CPH Engineers Supplement No. 25 Emergency Design & Inspection Services North Lake Triplet/Secret Lake Park Chanel Project
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2008 Resolutions
>
08-1943 CPH Engineers Supplement No. 25 Emergency Design & Inspection Services North Lake Triplet/Secret Lake Park Chanel Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2008 7:14:09 PM
Creation date
9/24/2008 7:13:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
9/22/2008
Doc Number
08-1943
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 7 <br />GENERAL CONDITIONS <br /> <br />A. Since the ENGINEER has no control over the cost of labor, materials, or <br />equipment or over any construction method of determining prices, any <br />opinion of probable construction cost which may be provided in the services <br />of this Supplement are made on the basis of his experience and <br />qualifications and represent his best judgment as a design professional <br />familiar with the construction industry, but the ENGINEER cannot and does <br />not guarantee that the construction cost will not vary from opinions of <br />probable cost prepared by him. Similar limitations apply to construction <br />schedules reviewed or prepared by the ENGINEER. <br /> <br />B. The OWNER and the ENGINEER each binds himself and his partners, <br />successors, executors, administrators and assigns to the other party of this <br />Supplement and to partners, successors, executors, administrators, and <br />assigns of such other party in respect to all covenants of this Supplement. <br />Nothing herein shall be construed as creating any personal liability on the <br />part of any officer or agency of any public body which may be a party hereto, <br />nor shall it be construed as giving any rights or benefits hereunderto anyone <br />other than the OWNER and the ENGINEER. <br /> <br />C. The ENGINEER agrees to initiate work promptly upon receipt of <br />authorization to proceed and to prosecute the work in an expeditious and <br />timely manner until the Project is completed based on timely performance by <br />the developer and his Engineers, and any other parties involved. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.