Laserfiche WebLink
<br />Project <br /> <br />includes <br /> <br />the <br /> <br />following: <br /> <br />Sidewalk, <br /> <br />curb <br /> <br />and <br /> <br />gutter, <br /> <br />installation of stormwater pipes and construction of stormwater <br /> <br />pond (s), collectively referred to as the "COUNTY Project." The <br /> <br />COUNTY's financial share of the Joint Project is approximately 75.52% <br /> <br />of the engineer's estimated construction cost; and <br /> <br />WHEREAS, the CITY desires, at its own expense, to construct and <br /> <br />modify its water and sewer system located in the right-of-way of <br /> <br />Anchor Road, herein referred to as the "CITY Project"; and <br /> <br />WHEREAS, the COUNTY desires the CITY to include and incorporate <br /> <br />the COUNTY Project into a single contract to be managed by CITY, along <br /> <br />with the contract for construction of the CITY Project (hereinafter, <br /> <br />"Joint Project"), and the CITY is willing to provide such work under <br /> <br />the terms and conditions hereinafter...set forth; and <br /> <br />. <br />WHEREAS, this agreement is::iit~uthorized by the provisions of <br /> <br />Chapters 125, 163 and 166, Florida Statutes, and other applicable law. <br /> <br />NOW, THEREFORE, for and in consideration of the mutual covenants <br /> <br />herein contained, the COUNTY and the CITY agree as follows: <br /> <br />SECTION l. <br /> <br />PURPOSE. <br /> <br />The purpose of this Agreement is for the <br /> <br />CITY to provide the following work to the COUNTY in the manner <br /> <br />hereinafter set forth: <br /> <br />(a) All work relating to the Anchor Road improvement project is <br /> <br />to be accomplished according to the plans, specifications and bid <br /> <br />documents prepared by Inwood Consulting Engineers for the Joint <br /> <br />Project, which plans, specifications and bid documents are hereby <br /> <br />incorporated herein by reference. If, at the time of the bid award, <br /> <br />the projected construction cost for the complete Joint Project exceeds <br /> <br />Joint Facilities Agreement <br />Seminole County I City of Casselberry <br />Page 2 of 11 <br />