<br />Exhibit 'A'
<br />
<br /> PRIEI.IMI",~RY'~RP~'.E~T...c:9NST~l.J.c:TION...COST ...
<br /> ....
<br /> ANCl:IClR ROADcPIlaSe IlcM<m'il St.to Lyrn_t1Rd. i ......
<br /> ROADWAY ITEMS
<br />101-1 MOBILIZATION (10% OF ROADWAY SUBTOTAl) LS 1 $93,920.11 $93,920.11
<br />102-1 MAINTENANCE OF TRAFFIC (10% OF PROJECT) LS 1 $85,381.92 $85,381.9
<br />104-10-2 SYNTHETIC BALES LF 44 $10.09 $443.'
<br />104-12 STAKED TURBIDITY BARRIER LF 13. $5.98 $831.22
<br />104-13-1 STAKED SilT FENCE (TYPE 3) LF 5005 $0.96 $4,804.80
<br />104-16 ROCK BAGS EA 262 $9.21 $2,413.02
<br />12()"1 REGULAR EXCAVATION CY 5464 $6.02 $32,893.2
<br />12D-<! EMBANKMENT CY 4404 $12.20 $53,728.&
<br />160-4 TYPE 8 STABILIZATION SY 13159 $4.99 $65,663.41
<br />425-1-351 CURB INLET TYPE 5 (<10') EA " $4,095.36 $57,335.0.
<br />425-1-361 CURB INLET TYPE 6 (<10') EA 7 $4,443.47 $31,104.2
<br />425-1-451 CURB INLET TYPE 5 (<10') (J..BOTTOM) EA 1 $6,276.84 S6,276.~
<br />425-1-461 CURB INLET TYPE 6 (<10'\ (J-BOTTOM) EA 1 $6,478.86 $6,478.8
<br />425-1-521 OBI TYPE C NO PAVT. (4.5X3.3) (<10') EA . $2,686.02 $10,744.0
<br />425-1-531 OBI TYPE C MODIFIED 6' SW(<10') EA 2 $2,893.13 $5,786.2
<br />425-1-533 OBI TYPE C MODIFIED 6' SW (<10') (J-BOTTOM) EA 2 $5,792.75 $11,585."1'
<br />425-2.01 MANHOLE (P-8) (<10') EA 2 $3,628.50 $7,257.00
<br />425-2-91 MANHOLE (J-8) 1<10') EA 2 $5,990.92 $11,981.84
<br />425-5 ADJUSTING MANHOLES (STANDARD) EA 2 $630.54 $1,261.08
<br />430-171.101 STORM SEWER PIPE CULVERT RCP (UP TO 24-) LF 1641 $69.34 $113,786.9-<
<br />430-171-102 STORM SEWER PIPE CULVERT RCP (25- to 36") LF 662 $106.92 $70,781.f\l
<br />430-171-201 EllIP. STORM SE\NER PIPE CULVERT OPT MTRL (UP TO 24") EA 123 $74.14 $9,119.2
<br />430-963-1 PVC PIPE 14") LF 30 $14.89 $446.7
<br />430-982-125 MITERED END SECTION (18- RCP) EA 1 $1,025.91 $1,025.91
<br />430-982-129 MITERED END SECTION (24- RCP) EA 3 $1,766.26 $5,298.7
<br />430-982.625 MITERED END SECTION (14-X23- ERCP) EA 3 $945.42 $2,836.2
<br />515-2-301 PEDESTRIAN RAILING IAlUMINUM) (PICKETT) LF 72 $52.63 $3,789.3
<br />520-1-10 CONCRETE CURB AND GUTTER (TYPE F) LF 6724 $17.62 $118,476.8.1
<br />520-2-2 CONCRETE CURB AND GUTTER (TYPE B) LF 54 $17.75 $958.5
<br />522-1 CONCRETE SIDEWALK, 4- THICK SY 3671 $41.74 $153,227.5
<br />522-2 CONCRETE SIDEWALK, 6- THICK SY 764 $50.81 $39,835.0.
<br />530.3-3 RIPRAP-RUBBlE (BANK & SHORE) TN 22.9 $95.56 $2,188.32
<br />570-1 PERFORMANCE TURF (CONTRACTOR'S OPTION) 8Y 10540 $1.13 $11,910.2
<br />700-20-11 SIGN SINGLE POST C<12 SF) (F&I) AS 26 $322.60 $8,387.61
<br />700-20-60 SIGN EXISTING (REMOVE) (SINGLE POST) AS 38 $33.19 $1,161.65
<br /> ROADWAY TOTAL $1.033,121
<br />
<br />08.20.08
<br />
|