My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & Z Minutes 09/12/2007
Laserfiche
>
City Clerk's Public Records
>
Minutes
>
Advisory Board Minutes
>
Planning & Zoning Commission Minutes
>
P & Z Minutes Archives
>
2007 P & Z Minutes
>
P & Z Minutes 09/12/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 5:05:00 PM
Creation date
8/25/2008 4:37:12 PM
Metadata
Fields
Template:
City Clerk
Meeting Type
Regular
City Clerk - Doc Type
Minutes
City Clerk - Date
9/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Planning & Zoning Commission.! <br />Local Planning Agency <br />September 12, 2007 <br />Page 2 <br /> <br /> <br />Smith, <br /> <br /> <br />the <br /> <br /> <br />provIded in <br /> <br /> <br />dated <br /> <br />5, 2007, to the City of Casselberry Planning and Zoning Commission (a copy is on file in the Cornrnunity <br /> <br /> <br />Srnith <br /> <br /> <br />history of <br /> <br /> <br />and <br /> <br /> <br />two <br /> <br /> <br /> <br />some of <br /> <br /> <br />to as <br /> <br /> <br /> <br /> <br />were provided by <br /> <br /> <br />to the <br /> <br /> <br />of <br /> <br /> <br /> <br />on <br /> <br /> <br /> <br />Ftorida, <br /> <br /> <br />August 16 and September 5j <br /> <br />the supporting <br /> <br /> <br />to <br /> <br /> <br />reportr the <br /> <br /> <br />of <br /> <br /> <br />following <br /> <br /> <br />1. Approval of the schoof use is specifically for the primary educational functions attributed to an <br />or institution the proposed ancillary uses, including ball fields1 a <br />stadium. Review of this development plan is conceptual only and all details for final permitting shall be <br />submitted for review and final approvals. <br /> <br />2, The construction of the pedestrian \4lalkvlay around the retention area and the internal road'Nay <br />connection bCPNeen the rcsidonti31 community and the school site sheil! be completed in conjunction <br />vlith the first pRase of construction of the school. <br /> <br />3, The Gondorninium use in Tract B wilt adhere to the design requirements provided apartments in <br />ULDR Section <br /> <br />4. The connection of the pedestrian walkway around the retention area and the internal roadway between <br />the residential community and the school shall completed in conjunction with the first phase of <br />construction of the school or development of Sf or whichever site develops <br /> <br /> <br />5, As a participant in the Master Association for the Legacy Park Planned Developmentf Geneva School <br />and its assigns agree tOl and are responsible forr their pro..rata of the construction of the Village <br />Center Plaza~ as indicated on the site plan. The City must provide site plan review and approval of the <br />plaza prior to construction. <br /> <br />6. The amended conceptual plan shall be further revised to incorporate the conclusions of the L TEe traffic <br />study dated March 29, 2007 and/or the requirements of the Seminole County Traffic Engineering <br />Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.