Laserfiche WebLink
<br />Notes: <br /> <br />1. One ERU Factor is equivalent to 300 gpd. <br />2. For all establishments not listed above, the total equivalent <br />residential unit (ERU) value shall be determined by multiplying the <br />number of fixture units, as published in the Southern Plumbing Code <br />by twenty-five (25), and then dividing that numerator by 300 <br />GPD/ERU, then multiplying by $2,091. <br /> <br />Total ERU Value = Number of fixture units X 25 <br />300 <br /> <br />For example, the <br />has a fixture unit <br />then divide it by <br />total fee: <br /> <br />Southern Plumbing Code indicates a kitchen sink <br />value of 2. Simply take the 2, multiply by 25, <br />300, then multiply it times $2,091, to get your <br /> <br />(2 x 25/300) x $2,091 = $349 <br /> <br />3. For industrial facilities or other facilities where the schedule or <br />above formula is not applicable, the equivalent ERU's and flows <br />shall be evaluated on an individual basis to determine the Sewer <br />Charge Fees. <br /> <br />living <br />charges <br /> <br />(2) There is hereby established a one-time connection <br />unit served of $800 per unit inside the city limits. <br />shall be according to the following schedule: <br /> <br />charge per <br />Commercial <br /> <br />Meter Size (Inches) <br /> <br />Cost <br /> <br />5/8 x 3/4 <br />1 <br />1 1/2 <br />2 <br />3 <br /> <br />$ <br />$ <br />$ <br />$ 8,000* <br />$24,000* <br /> <br />800 <br />1,200 <br />4,000 <br /> <br />*The City Public Works <br />discretion, prescribe <br />meters based on unusual <br /> <br />Director or his designee may, at their sole <br />an additional deposit for 2-inch or larger <br />anticipated sewer use. <br /> <br />(C) Outside City Customers: <br /> <br />The sewer benefit fees and connection fees shown above <br />are for service within the City limits. For service <br />outside the City, multiply the sewer benefit fee and <br />connection fees for service within the City limits by a <br />factor of 1.25 effective December 1, 1991 and thereafter. <br /> <br />(D) All <br /> <br />costs <br /> <br />germane <br /> <br />to <br /> <br />the <br /> <br />construction, <br /> <br />-5- <br />