My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-1778 North Winter Park Drive Subsurface Utility Verifications
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2007 Resolutions
>
07-1778 North Winter Park Drive Subsurface Utility Verifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2007 9:41:12 AM
Creation date
4/11/2007 9:41:12 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
4/9/2007
Doc Number
07-1778
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 <br />Mr. Gerald Chancellor <br />Winter Park Drive from Seminola Boulevard t07th Street - Gravity Sewer Replacement <br />March 23, 2007 <br /> <br />4. Any asphalt/concrete removed will be repaired using like materials. <br /> <br />5. Tie each test hole location into a minimum of three visible physical features to enable <br />this data to be added to your base map and also enable future recovery, <br /> <br />The final product will be Test Hole Data Reports/Sketches ofthe project area reflecting all pertinent data <br />for your use. <br /> <br />It is our understanding that the City of Casselberry will make available all plans and utility records that <br />have been obtained for this site. Additional research will only be conducted if requested by the City of <br />Casselberry. Please note that non-metallic lines without trace wire cannot be traced with conventional <br />designating equipment. Every effort will be made to identify the location of underground utilities within <br />the project area. However, please note that Southeastern Surveying and Mapping Corporation will not <br />be responsible for utility lines which are not field located or shown on plans and/or records provided to <br />our personnel. <br /> <br />M.O.T. will be used only ifabsolutely necessary and these invoice charges will be an addition to the total <br />per day rate and reflected on our invoice to you. <br /> <br />Note: Ifpermitting is required for said work, these charges will also be additional and reflected on our <br />invoice to you. <br /> <br />Note: Test Holes that require a depth of greater than ten (10) feet, or require a substantial amount of <br />increased effort (sleeving, shoring, de-watering, etc.), then said Test Holes may need to be negotiated <br />separately on a case by case basis if normal vacuum excavation practices do not allow said utilities to <br />be exposed. <br /> <br />Note: Any additional overlaying or restoration of pavement, other that the replacement of materials <br />removed and cold patched, will be the responsibility of the City of Casselberry, <br /> <br />Our fee for the above referenced work is outlined on the attached fee schedule, <br /> <br />If a Waiver of Subrogation is requested in a Professional Services Agreement, there will be a fee of <br />$150,00 added to this project agreement. <br /> <br />We anticipate completion of the above described work within three (3) weeks after receipt ofa written <br />notice to proceed. Payment is expected within thirty (30) days from date of invoice. <br /> <br />G:\DATA\Proposal\City ofCasselberry\48918 Wimer Pk Dr-from Seminola Blvd 10 7th SI.OSR REV.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.