My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-1669 Water Main Pipe Bursting Proposal - Murphy Pipeline Contractors, Inc.
Laserfiche
>
City Clerk's Public Records
>
Resolutions
>
Resolutions Archives
>
2006 Resolutions
>
06-1669 Water Main Pipe Bursting Proposal - Murphy Pipeline Contractors, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 12:27:58 PM
Creation date
4/5/2007 12:27:58 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Doc Type
Resolutions
City Clerk - Date
4/10/2006
Doc Number
06-1669
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"EXHIBIT A" <br />M I=>>C <br />U Murphy Pipeline <br />Contractors, Inc <br /> <br />March 29,2006 <br /> <br />City of Casselberry <br />Utilities Commission <br />95 Triplet Lake Dr. <br />Casselberry, FL 32707 <br /> <br />Re: Canigan A venue, Azalea Avenue, Magnolia Avenue, Lakemont Avenue, Linden <br />Road, Elsinore Avenue & Ivy Lane Pre-Chlorinated Pipe Bursting Water Main <br />Replacement & Repair Project <br /> <br />Dear Utilities Commission: <br /> <br />Murphy Pipeline Contractors, Inc. will extend its prices per the contract documents of the Fort <br />Pierce Utilities Authority South Indian River Drive Water Main Replacement Project to the City <br />of Casselberry, Florida. <br /> <br />Murphy Pipeline Contractors, Inc. prices for pre-chlorinated pipe bursting of replacement of2" <br />galvanized pipe to 2" HOPE or 2" Fusible PVC is $27 per Iinear foot. This price includes <br />fittings, materials and pre-chlorinated pipe bursting. The line item prices that would be reduced <br />from the Fort Pierce contract for the 2" section of the City of Casselberry's project are valves. <br />The price for valves on the 2" section would be $250 each, which includes material and <br />installation. MobilizationlDe-Mobilization would also be reduced to $10,000. <br /> <br />The price for 2" HOPE and 2" Fusible PVC is the same and the choice is at the discretion of the <br />City of Casselberry. The one advantage of the use of 2" HDPE for the project pertains to the <br />aesthetics of the overall project 2" HDPE is available on coils and thus would not be needed to <br />be butt fused together as 2" Fusible PVC would be. The coils generally aid in increasing <br />production rates and reducing pipe sections strung out. <br /> <br />We would recommend attempting to pipe burst the approximately 600 feet of existing 2" <br />galvanized main with 6". It must be IUIderstood that it is a difficult upsize, but if successful, will <br />reduce restoration costs significantly on this portion. If the attempted upsize is unsuccessful, the <br />worst case scenario would be to open cut this section. <br /> <br />We should be able to start this project by the middle to end of May. It is anticipated that the time <br />line for completion of this job after we were to receive the Notice to Proceed should be 10 <br />weeks. <br /> <br />"'.......h..n, I t C. ..O"nnrl... . P F) l:I,..~ } rl ~''''6 .. I...o\;l"",.,l.n~' INI.. '<':'')1.1 <br />Soufner'Tl U.S, .. CnrihbPon..: 124.'3.4 SUohnslndu:;triol P<lrkwoy Sooth ..Jacbonville, Fl32246 <br />
The URL can be used to link to this page
Your browser does not support the video tag.