Laserfiche WebLink
<br />"EXHIBIT A" <br />M I=>>C <br />U Murphy Pipeline <br />Contractors, Inc <br /> <br />March 29,2006 <br /> <br />City of Casselberry <br />Utilities Commission <br />95 Triplet Lake Dr. <br />Casselberry, FL 32707 <br /> <br />Re: Canigan A venue, Azalea Avenue, Magnolia Avenue, Lakemont Avenue, Linden <br />Road, Elsinore Avenue & Ivy Lane Pre-Chlorinated Pipe Bursting Water Main <br />Replacement & Repair Project <br /> <br />Dear Utilities Commission: <br /> <br />Murphy Pipeline Contractors, Inc. will extend its prices per the contract documents of the Fort <br />Pierce Utilities Authority South Indian River Drive Water Main Replacement Project to the City <br />of Casselberry, Florida. <br /> <br />Murphy Pipeline Contractors, Inc. prices for pre-chlorinated pipe bursting of replacement of2" <br />galvanized pipe to 2" HOPE or 2" Fusible PVC is $27 per Iinear foot. This price includes <br />fittings, materials and pre-chlorinated pipe bursting. The line item prices that would be reduced <br />from the Fort Pierce contract for the 2" section of the City of Casselberry's project are valves. <br />The price for valves on the 2" section would be $250 each, which includes material and <br />installation. MobilizationlDe-Mobilization would also be reduced to $10,000. <br /> <br />The price for 2" HOPE and 2" Fusible PVC is the same and the choice is at the discretion of the <br />City of Casselberry. The one advantage of the use of 2" HDPE for the project pertains to the <br />aesthetics of the overall project 2" HDPE is available on coils and thus would not be needed to <br />be butt fused together as 2" Fusible PVC would be. The coils generally aid in increasing <br />production rates and reducing pipe sections strung out. <br /> <br />We would recommend attempting to pipe burst the approximately 600 feet of existing 2" <br />galvanized main with 6". It must be IUIderstood that it is a difficult upsize, but if successful, will <br />reduce restoration costs significantly on this portion. If the attempted upsize is unsuccessful, the <br />worst case scenario would be to open cut this section. <br /> <br />We should be able to start this project by the middle to end of May. It is anticipated that the time <br />line for completion of this job after we were to receive the Notice to Proceed should be 10 <br />weeks. <br /> <br />"'.......h..n, I t C. ..O"nnrl... . P F) l:I,..~ } rl ~''''6 .. I...o\;l"",.,l.n~' INI.. '<':'')1.1 <br />Soufner'Tl U.S, .. CnrihbPon..: 124.'3.4 SUohnslndu:;triol P<lrkwoy Sooth ..Jacbonville, Fl32246 <br />