Laserfiche WebLink
<br />EXHIBIT A <br />SCOPE OF SERVICES <br />AMENDMENT NO.1 OF SUPPLEMENT NO.3 <br />NORTH WINTER PARK DRIVE <br />March 10, 2006 <br /> <br />Task 1. The original scope of this project included the design of three detention ponds. <br />During the preliminary design process it was determined that six ponds would <br />be required. One of the six ponds will be a compensating treatment pond <br />located west of Gee Creek. Included in this work effort is the design and plan <br />preparation associated with the three additional ponds. <br /> <br />Task 2. The City has decided to extend the sanitary sewer along Belle Avenue to serve <br />existing and future businesses. The utility work effort will include the design of <br />the sewer line extension and preparation of an additional utility plan sheet. <br /> <br />Task 3. Lotspeich and Associates, Inc. will perform an environmental assessment and <br />flag wetlands on the three parcels associated with the proposed compensating <br />treatment area west of Gee Creek. <br /> <br />Task 4. Southeastern Surveying & Mapping Corporation will supplement the existing <br />survey to include the SR 434 intersection, location of wetland flagging, location <br />of pond borings, topography of compensating treatment area and adjoining <br />roadway, topography of Belle A venue. spot elevation at Gee Creek bridge and <br />miscellaneous spot elevations for pond areas that are outside original survey <br />limits. <br /> <br />Task 5. Ardaman & Associates, Inc. will supplement the existing geotechnical <br />investigation to include all the pond sites and swale treatment areas which have <br />shifted or have been added since the original scope was prepared. They will <br />perform permeability testing at each location. <br />