Laserfiche WebLink
<br />HIGHWAY TASK LIST <br /> <br />PROJECT NMfE: <br />CLlENT <br />TEl PROJECT ~o.: <br />COMa 1.T ANI NAME: <br />CONSFLTANT PHONE NO,: <br />ESTIMATOR: <br /> <br />Nol1h "'lAin PBrk Drive Rralienmrnf from Srminola Dh:d. to SR 434 .. Amrnd. No. j to SuPp. Nu. 2 <br />CitvofCaudhc:rrv <br />"\(1476 PLOU7 <br />TEl En~incers & Plnnncn <br />..\07-1I0~-(J~S5 (..\07-805.0227 Fllx) <br />KilTeR VlIn den Avonl P.E. <br /> <br />ACTIVITY: TASK 1- DRAINAGE ANALYSIS <br /> <br />SUBACTIVITY: <br /> <br />Pllnd design <br /> <br /> TASK BASIS NO. OF HarRS Noar TOTAL C.\OD <br /> OF l=NITS iUNIT SIIEETS "Ol'RS JlotlRS <br /> '-'F. REMARKS <br />1. Design ofCrOM Drllins EA U U 0 <br />2. Design ofRolldway Ditches LS 0 0 0 <br />3 Design of Outfall Ditches EA U " 0 <br />4. Intero.::lumge Drainage EA U 0 0 <br /> Dcsi!m <br />,. Design of Storm Sewer-. EA 2 2 . Design of syslcm 10 compensating treatment pond <br />6. Design and Plans for Stormwater EA 3 36 WH 3 Additional Poom (original scope inc. 3 ponds) <br /> Retention J Detention Fac. Project total is 6 pond! <br />7. Design of Special DrainAge LS 0 " 0 <br /> Sv&tem <br />8. Preparation of Bridge EA 0 0 0 <br /> Hvdraulie,s Report <br />9. Drainage Design Report LS 0 0 (I <br />10.0thc:r(Spel:ify) 0 0 0 <br />medilUl drains <br />1I.Olhc:r(Spel:ify) 0 <br />12. Ollll:r (Spel:ify) 0 <br /> SUBTOTAL 0 112 <br />13. Quality Control 5.10% 5% 111 6 <br />14. Supervision 5.100'0 5% 112 6 <br />" Field Re\'jews E,\ (I Il 0 <br />16. Progres.~ Meetings EA 0 0 0 <br /> SrDTO'L\L 0 " <br /> TOTAL 0 "4 <br /> <br />,,, <br /> <br />(1, <br /> <br />Pl <br /> <br />,<) <br /> <br />,~ <br /> <br />'" <br /> <br />In <br /> <br />,., <br /> <br />Winter Park Drive Final Design Supplemental 3-06 <br />